Barking and Dagenham
|
|
|
Location: A406 Description: Cycle
Track toucan crossings and lighting under flyover. Improved access
and safety for cyclists negotiating a major junction. This has addressed
a
past accident record at this busy intersection. Provides connection
between Barking and Newham centres.Cost: £265 553
Photo date: 24/10/03 |
 |
| Location: Whalebone Lane South Description: Advisory
Cycle Lanes. Lanes on carriageway in both directions provide a north-south
route through borough linking Romford town centre, via High Road. Cost: £50
000
Photo date: 28/10/03 |
|
|
Brent
|
|
| Location: LCN+ Route 86 Description: Signing,
number patch markings to aid cycle users in navigating route. Traffic
calming to makeconditions safer.
Cost: £30,000
Photo date: 23/10/03 |
 |
| Location: LCN+ Route 45 Harlesden to Kenton
Description: Signing Route Signing, number patch markings
to aid cycle users in navigating route. Traffic calming to makeconditions
safer. Cost: £30 000
Photo date: 23/10/03 |
 |
| Location: LCN+ Route 86 Sudbury Court Drive Roundabout Description: Toucan
Crossing & Cycle Track. Safe cycle/pedestrian crossing facility. Links
to Northwick Park Hospital and towards Harrow on Hill. Cost: £81
053
Photo date: 23/10/03 |
|
| Bromley |
 |
| Location: Jubilee Park Description: Cycle
track provides most direct daytime traffic free route option between Orpington/
Petts Wood and Bromley Town Centres. Cost: £72 500
Photo date: 27/10/03 |
 |
Location: LCN+ Route 22. Southborough lane - Blackbrook
Lane. Alternate Night route. Description: Cycle
lane on uphill section This route provides
signing and cycle lanes as an alternative to Jubilee Park at night. The
cycle lane is to assist cycle users for uphill gradient.
Cost: £19 500
Photo date: 6/11/03 |
|
| Camden |
 |
| Location: LCN+ Route 0 (Seven Stations). Woburn
Place - Gordon Sq Description: Segregated Two Way
Cycle Track. Provides a kerb segregated high quality cycle track. This
forms an important east-west section of the Seven Stations route towards
Euston/Kings Cross stations and the University. Cost: £300
807
Photo date: 28/10/03 |
 |
Location: LCN+ Route 6. St Pancras Way to North
of Royal College Street. Segregated Two Way Cycle Track Description: Provides
a contraflow facility with kerb segregated benefits for cycle users and
pedestrians for northbound use towards Holloway, Islington and
southbound use towards Euston & Kings Cross stations. Cost:
£200 193
Photo date: 14/11/03 |
|
|
Corporation of London
|
|
|
Location: Goodmans Yard Description:
Feasibility and design. A joint project with TfL to outline design for
completion/upgrade of segregated cycle track. Scheme to link the City
with East London & DLR as continuation of facilities along Cable St.
Improvements aimed to serve cycle users crossing the congestion
boundary. Cost: £28 482 Photo date: 30/10/03 |
|
| Enfield |
|
Location: LCN+ Route 88 Slades Hill / Enfield Rd Description: Cycle
Track Upgrade. Upgrade of cycle track include side entry treatments and
kerb build outs has provided and improved east west route for cyclists. Cost: £78,568
Photo date: 19/12/03
|
|
| Greenwich |
 |
Location: Eltham Common - Well Hall
Rd to Westmount Rd Description: Cycle
Track. Path has been upgraded through the Eltham Common to provide a suitable
width for by both cycles and pedestrians to use.
Cost: £18,366
Photo date: 27/10/03 |
|
| Hackney |
 |
Location: LCN+ Route 10. Pitfield St Description: Contraflow
kerb segregated cycle track, including parking bays and traffic calming
measures, provides safe Kingsland Rd alternative route direct to Old Street
and the City for large volume of cyclists (over 300
cyclists rode this route contraflow prior to implementation). Cost: £249,284
Photo date: 28/10/03 |
|
|
Hammersmith and Fulham
|
|
|
Location: New Kings Road Description:
ASL’s & Coloured Continuous Advisory Cycle Lanes Improvements
are ongoing in providing continuous cycle facility on this busy corridor
between Putney Bridge and the southern parts of Kensington and Chelsea
.
Cost: £28 000
Photo date: 23/10/03 |
|
Location: LCN+ 44 Hammersmith Rd Description: Advanced
Stop Lines (ASL’s) &
Advisory Cycle Lanes. These facilities provide continuous route for cyclists
from the Kensington border at Olympia Station to Hammersmith Broadway and
links to Hammersmith Bridge and the west. This corridor has the highest
cycle flows in the borough and previously had no cycle facilities. Cost: £67,000
Photo date: 23/10/03
|
|
Location: LCN+ Route 44. Hammersmith Broadway Description: Advanced
Stop Lines & New Southern Link. This is the first stage of cycle-friendly
treatment of Hammersmith Broadway in advance of finding from review & feasibility
studies for the area. A new
southern route has been identified and introduced to help east to west
cycle movements avoiding the busy gyratory. Cost: £86,000
Photo date: 21/5/03
|
|
| Haringey |
 |
Location: LCN+ Route 10 & 54 Description: Upgrades
to Cycle Lanes & Tracks. Cycle lane surfacing upgrades. Improvements
to conditions of lanesfor cyclists, particularly along
Broad Lane and Ferry Lane. Cost: £24,621
Photo date: 27/10/03 |
|
| Harrow |
 |
| Location: LCN+ Route 89 Alexandra Ave Description: Two
way segregated cycle track. Two way cycle track provides a safe cycle route
from Rayners Lane towards Northolt, Ealing. Cost: £256,198
Photo date: 19/12/03 |
 |
| Location: LCN+ Route 88 Alexandra Ave Junction With
Eastcote Lane Description: Feasibility of junction treatment
to improve access for cycle users. Cost: £5,600
Photo date: 15/10/03 |
|
| Hillingdon |
|
| Location: LCN+ Route 89. High Road Ickenham Description: Two
way cycle track, cycle lanes and improved crossings. Segregated cycle track
linking Ickenham with West Ruislip Station. Cost: £155,988
Photo date: 27/10/03 |
|
|
Hounslow
|
|
|
Location: Hanworth Road Description:
Advisory Cycle Lanes & Track. Provision of cycle lanes along Hanworth
Rd and also two way segregated cycle track along Wellington Rd South.
This
provides an extension to an existing cycle link from Hounslow Town
Centre. Cost: £45 880
Photo date: 17/10/03 |
|
| Islington |
|
| Location: LCN+ Route 0 (Seven Stations). Skinner
Street Description: Segregated cycle tracks (with flow)
to assist with uphill and downhill Gradient. Kerbed cycle track segregating
cyclists from parked vehicles and other road users. Important east-west
link between Camden and Islington as part of the Seven Stations route.
This assists cycle users for a short section of uphill route. Cost: £100
000
Photo date: 20/10/03 |
|
| Location: LCN+ Regents Canal Route on road link Description: Signing
and Lining. Provides on-road east-west connection through the borough and
access to the Regents Canal. Cost: £25,000
Photo date: 20/10/03 |
|
|
Kingston
Upon Thames |
|
Location: Canbury Park Road Description:
Contraflow
cycle track upgrade. Upgrade to improve contraflow facility of
one-way street providing cycle users with a direct link to Kingston
BR Station and town centre. Cost: £6 000
Photo date: 11/11/03
|
|
|
Location: Richmond Road Description:
Cycle lanes with buffer area to assist younger cycle users to nearby
secondary school also provides direct link to Ham High St and
Teddington Lock. Cost: £49 350
Photo date: 22/7/03
|
|
|
Location: The Cut Description:
Upgrade Path Parallel Rail Line Surfacing improvements have improved the
comfort of ride and width of cycle track. Direct traffic free
route to New Malden BR station and New Malden High St. Cost:
£12 000
Photo date: 28/10/03 |
|
Location: LCN+ Route 74 Kingston Rd Description: Cycle
Lanes integrated with
Bus Scheme. Cycle lanes provide continuous peak hour route between Kingston
and New
Malden town centres, integrated with recently installed bus lanes. Cost: £28
749
Photo date: 28/10/03 |
|
|
Newham
|
|
|
Location: Romford Road Mandatory Cycle Lanes (during
peak periods) Description: On carriageway cycle lanes
from the A406 to Stratford providing a rapid commuter east-west link
from Ilford at peak hours. Cost: £71
612
Photo date: 24/10/03
|
|
Location: LCN+ Route 11 Stratford Gyratory / Manbey
Rd Description: Cycle Track & Cycle Lanes. On and
off carriageway cycle route (segregated and non-segregated) linking Romford
Rd to the cycle routes around Stratford incl. The shopping precinct and
station.
Cost: £105,726
Photo date: 29/10/03 |
|
|
Redbridge
|
|
|
Location: Woodford Road Description:
Advisory Cycle Lanes with flow cycle lanes providing space for cyclist
on north-south route Cost: £76 075
Photo date: 28/10/03 |
|
Location: LCN+ Route 55 Riverdene Rd to Uphall Rd Description: Upgrade
cycle track and signing of a point no entry except for cycles. The track
along road closure provides
a route towards Ilford, parallel to North Circular. Facility improves comfort & access
by bike also serves local school. Cost: £55 027
Photo date: 28/10/03 |
|
|
Richmond
|
|
|
Location: Church Road Description:
Advisory Cycle Lanes & Logos. Cycle lanes and logos provide direct
route connecting Sheen Rd to Richmond BR Station Town Centre and commuter
route towards Kew & South Ealing . Cost: £15
000
Photo date: 28/10/03 |
|
|
Location: Sheen Road Description:
Advance Stop line and feeder lane. Advance stop line enables cycle users
on route from Sheen to position themselves at signals for right turn to
Richmond BR Station Town Centre and other amenities including leisure
centre & Old Deer Park. Cost: £5 900
Photo date: 28/10/03 |
|
Location: Strawberry Vale Description:
Cycle Bypass to Roundabout &
Traffic Calming Entry Treatments - Cycle friendly measures to
roundabout have reduced speed of traffic and provided cycle bypass
to roundabout from Twickenham towards Teddington. This facility
provides continuity to the exisiting cycle lanes connecting
Twickenham & Teddington Lock . Cost: £31
467
Photo date: 28/10/03
|
|
|
Southwark
|
|
Location: Chauver Drive Description:
Point no entry except for cycles. This has benefits for pedestrians and
cycles as a quiet traffic route and provides a direct cycle through
route avoiding congested roads. Improvements to shared facilities include
upgrading with tactile paving and signs. Cost:
£21 605
Photo date: 22/10/03
|
|
| Sutton |
|
| Location: LCN+ Route 75. Collingwood Rec to Green Lane
to Collingwood Road Description: Two Way Cycle Track
(Traffic Free) through park linking Sutton Town centre and nearby amenities
including school. Cost: £122 000
Photo date: 30/10/03
|
|
|
Tower Hamlets
|
|
|
Location: Burdett Road Description:
Advisory Cycle Lanes & Parking Bays - Cycle lanes provide direct north
to south connection between Docklands Victoria Park. Parking bays
marked to improve continuity of route for cycle users to reduce sudden
swerving movements reducing potential conflicts .Cost:
£115 691
Photo date: 24/10/03 |
|
Location: LCN+ Route 15. Royal Mint Street / Cable
St Description: Segregated Two Way Cycle Track. Cycle
track provides continuation of cycle route in both directions, linking
Docklands Light Rail (DLR) and the City. Cost: £105,144
Photo date: 22/8/03
|
|
|
Waltham Forest
|
|
|
Location: Forest Road Description:
Provision of contra-flow cycle facilities on Pretoria Rd and Pembar
Ave to enable cycle users to cross Forest Rd at toucan crossing.
Provides a link from Chingford to Hackney. Cost: £20
593
Photo date: 28/10/03
|
|
|
Location: Grove Green Road - Advisory Cycle Lanes &
Traffic Calming Description: Segregated cycle lanes and
traffic calming measures provide improved environment for cyclists using
routes. Cost: £52 267
Photo date: 28/10/03
|
|
| Wandsworth |
 |
| Location: LCN+ Route 29 Garrat Lane & Route 37
Battersea Park Rd - York Rd (A3205), Putney Bridge with Frogmore & Upper
Richmond Rd Description: Feasibility Studies. Investigation
to better facilitate cycle users for commuting from South and South West
towards London. These studies also serve to improve access to high Streets
and town centres (Sheen, Putney & Wandsworth). Cost: £27,239
Photo date: 11/12/03 |
 |
| Location: LCN+ Route 5. Queenstown Rd Description: Cycle
Track (With Flow). Improvements to off carriage way cycle track provides
direct connection to Chelsea Bridge and towards Victoria Station. Cost: £92,462
Photo date: 11/12/03 |