|
Brent
|
|
Location: Northwick Park to Sudbury Description:
Completion of route including installation of new Toucan crossing and upgrade
of existing Pelican to Toucan crossing.
Cost: £150 099
|
|
Barking and Dagenham
|
|
Location: London Rd and Northern Relief Road.
Description: Relief Road - Works to enable cyclists to continue
east-west with lanes ASLs and logos Cost: £43 564
|
|
Bexley
|
|
Location: Danson Road Description:
Toucan crossing and associated two way cycle track and street scene
improvements. Cost: £120 000
|
|
Location: Westwood Lane Description:
Toucan crossing and associated footway widening to provide for a two way
track alongside pedestrian footway. Cost: £97 000
|
|
Bromley
|
|
Location: Monks Orchard Road Roundabout
Description: Advisory Cycle Lane and colour surfacing to
assist cycle users on uphill gradient. Cost: £50 00
|
|
Location: Sundridge Avenue Description:
Introduction of 1.5m wide Advisory Cycle Lanes in both directions. Provides
link to Bromley Town Centre from Elmstead. Cost: £75000
|
|
Camden
|
|
Location: Bury Place Description: Bury
Place converted to a two way for cycles with the introduction of a
segregated contra-flow facility. Toucan crossing also introduced at
junction with Bloomsbury Way to provide continuous north south route.
Works to introduce contra-flow cycle track has also progressed along
High Holborn in advance of 2004/5. Jointly progressed to coincide with
borough highway maintenance programme. Cost: £182 696
|
|
Location: St. Pancras Way Description:
Extension of route with completion of segregated two-way cycle track &
installation of dedicated cycle crossing across busy St Pancras Way
Provides a direct and safe connection for commuters between Upper
Holloway and Central London and serves trips to Camden Town.
Cost: £100 350
|
|
Location: Seven Stations Cycle Route - Woburn Place to
Gordon Square Description: Upgrade of signals at two
junctions incorporating pedestrian facilities; upgrade to footways &
associated provision of improved pedestrian facilities crossing cycle
track. Provides a journey saving to cycle users with separate phasing
to general traffic. Cost: £210 638
|
|
Croydon
|
|
Location: Gravel Hill Description:
Upgrade & conversion of existing shared use path creating continuous
attractive route between residential area and Bus/Tram in interchange at
Addington Village. Cost: £69 000
|
|
Location: South Norwich Park Description:
Introduction of 3 metre wide shared cycle / pedestrian path through park
area. Connects with Elmers End station and provides traffic free
section for National Cycle Route 21. Cost: £120 000
|
|
Location: Windmill Road Description:
St James’ Rd Contra-flow cycle lane with central islands kerb build-outs
and speed cushions. Signing route to link with Lambeth Boundary.
Cost: £36 000
|
|
Enfield
|
|
Location: Enfield Road Description:
Design work to improve existing sections of the LCN+ NE14 cycle route
including links to nearby trip generators (e.g schools stations).
Implementation of two Toucan crossings at Mollison Ave and Enfield
Road. Cost: £144 198
|
|
Greenwich
|
|
Location: Trafalgar Road Description:
Advanced stop lines and cycle bypasses at several banned left turn side
roads. Significant improvements for safety & accessibility of
vulnerable cycle users and pedestrians. Jointly funded by local
safety scheme to address accidents at side roads. Cost:
£55 000
|
|
Hackney
|
|
Location: Paul Street Description:
Complete local cycle link: Contra flow facility along Paul Street safety
improvements kerb works. Cost: £17 426
|
|
Location: Pitfield Street Description:
Study to identify accident problem and improve cycle safety. Implementation of
kerb build outs and cycle lanes. Cost: £114 485
|
|
Hammersmith and Fulham
|
|
Location: Hammersmith Road Description:
Advisory cycle lanes and links into the Broadway. Cost: £20
791
|
|
Location: New Kings Road Description:
Advance Stop Lines and Advisory Cycle Lanes. Cost: £77
737
|
|
Location: Uxbridge Road Description:
Complete Advanced Stop Lines and Advisory cycle lanes. Cost:
£72 516
|
|
Havering
|
|
Location: Chandlers Way Description:
Build out of kerbline and raised table intersection along with removal
of traffic island at the junction of Chandlers Way and Eastern Road to
ensure safe crossing for cyclists and pedestrians. Cost:
£44 355
|
|
Haringey
|
|
Location: Endymion Road Description:
Toucan Crossing provides safe access to Finsbury Park. Cost:
£141 162
|
|
Location: Mayes Road Description: New
Toucan crossings at Mayes Road Wood Green High Road. Cost:
£194 066
|
|
Hillingdon
|
|
Location: Uxbridge Road Description:
Continuation of cycle lane facilities : Cycle Lanes Kerb Realignment
Cycle Logos. Cost: £149 866
|
|
Harrow
|
|
Location: Greenford Road / Sudbury Hill
Description: Conversion of two crossing points into Toucans
advisory cycle lanes plus cycle tracks to crossing points 200m anti-skid
at Toucans. Cost: £127 000
|
|
Location: Harrow Road to Edgeware Road
Description: Detailed design & consultation paying special
attention to local retailers' interests: Route upgrade & completion;
signing and lining along Kenmore Ave. Cost: £21 763
|
|
Islington
|
|
Location: Bunhill Row Description: A
series of improvements to the existing prescribed route. Includes a
segregated contra-flow cycle lane on Bunhill Row & Featherstone Street &
improvements & streamlining of existing facilities on Leonard St & Bath
St. Cost: £125 000
|
|
Location: St. Pauls Road Description:
Toucan Crossing at St Pauls Rd junction with Canonbury Pl. & Wallace Rd
link to Canonbury Station. Cost: £40 500
|
|
Kingston
|
|
Location: Palmer Crescent to Brook Street
Description: Palmer Crescent to Brook St upgrade to parallel
cycle crossing. (see below)
|
|
Location: Ladybooth Road / Wheatfield Way Ladybooth
Rd/ Wheatfield Way Description: upgrade to 2- way cycle
track connecting with existing toucan crossing. London Rd toucan
crossing access improvements. Cost: £69 508
|
|
Location: Malden Road Description:
Upgrade cycle lanes with colour surfacing and entry treatments at side
roads. Cost: £65 054
|
|
Location: Portsmouth Road Description:
Completion of Advisory Cycle Lanes towards Thames Ditton to link with existing
cycle lanes to Kingston town centre. New advanced stop lines at
Portsmouth Rd / Brighton Rd. Cost: £14 545
|
|
Location: Portsmouth Road Brighton
Road Junction Description: Improvements for cycle users
and pedestrians. Includes ASL signals and re-layout of junction.
Cost: £59 749
|
|
Location: Hogsmill Bridge Description:
Upgrade surfacing 2-way cycle track to link to dedicated cycle bridge.
Cost: £31 146
|
|
Lambeth
|
|
Location: Lambeth Road Description:
Cycle gap at junction with Hercules Rd allows cycle bypass at the
traffic lights. Journey saving times for cycle users. Cost:
£30 500
|
|
Location: Bayliss Road Description:
Upgrade existing cycle lanes to LCN+ standards inc. islands & road
markings . Cost: £49 000
|
|
Location: Larkhall Lane Description:
Junction improvement including junction tightening improved cycle gap &
environmental enhancement Scheme coincided with resurfacing work.
Improvements to crossing distance sightlines signing lighting &
streetscene. Cost: £85 000
|
|
Location: Vauxhaul Street Description:
Kerb segregated contra-flow cycle lane to prevent parked cars providing
hazard to cycle users.
|
|
Lewisham
|
|
Location: Folkstone Gardens Description:
Introduction of shared use pedestrian / cycle path. Provides a a section of
traffic-free daytime route to Surrey Canal Rd. Cost:
£22 500
|
|
Location: Deptford Church Road Description:
Two way cycle track including carriageway reallocation and entry treatment at
junction with Creekside. serves college and connects with Deptford
Bridge DLR station. Cost: £93 370
|
|
Merton
|
|
Location: Croydon Road Description:
Introduction of cycle lanes in both directions with buffer zone.
Cost: £75 340
|
|
Location: Wimbledon Hill Description:
Introduction of parallel cycle crossing at junction and point entry
except cycles from Mansell Rd to Wimbledon Hill. Cost:
£85 300
|
|
Newham
|
|
Location: Stratford Bow Description:
Detailed Design and Consultation. Cycle track along Stratford High
Street. Cost: £25 000
|
|
Richmond
|
|
Location: Ham Gate Avenue Description:
1km shared pedestrian / cycle track to provide safe link from Ham
connect Richmond Park with Ham and towards Teddington Lock traffic free
river crossing and towpath. Cost: £119 889
|
|
Location: Strawberry Vale Description:
Entry treatment measures on approach to roundabout from minor roads &
cycle bypass for southbound use. Cost: £35 039
|
|
Southwark
|
|
Location: Greendale Description:
Surface upgrade of the Greendale Cycle track with associated
improvements to accessibility. Provides a comfortable and traffic free
section of north south route connecting Elephant & Castle and Crystal
Palace. Cost: £42 000
|
|
Location: Borough Road Description:
Junction re-design on Lambeth Road/Newington Road including ASLs.
Advisory Cycle lanes in Borough Road and raised zebra crossing.
Cost: £50 000
|
|
Location: Iiderton Road Description:
1.5m wide Advisory Cycle Lanes and ASLs. Provision for cycle users on
busy section of road links into signals at both junctions. Width limits
to reduce heavy traffic on cycle route. Finishing to signalised
junction. Cost: £40 000
|
|
Location: Rolls Road Description:
Traffic width restriction introduced and a raised table across junction
to improve safety of cycle users and local residents.
Cost: £62 000
|
|
Location: Southwark Bridge Road Description:
Additional Advisory Cycle Lanes to form a continuous link from Southwark
Bridge to the Elephant & Castle gyratory. Plus additional traffic
islands to protect cyclists and ASLs. Cost: £39 000
|
|
Sutton
|
|
Location: Colingwood Road Description:
New toucan crossing and advisory cycle lanes. Facility provides a safe
and direct continuation of existing cycle track across Collingwood
Recreation Ground towards Sutton Town Centre. Jointly funded with school
patrol crossing scheme . Cost: £24 000
|
|
Location: Collingwood Road Description:
Two Way Cycle Track final cost for drainage. Cost: £10 000
|
|
Tower Hamlets
|
|
Location: Cable Street Description:
Two way cycle track provides a contra-flow cycle facility along this
section of one way road. Connects with DLR local schools and a commuter
route towards the city. Cost: £160 000
|
|
Wandsworth
|
|
Location: Putney Bridge Road Description:
Upgrades to improve accessibility to existing toucan crossing. Includes
provision of cycle track and re-layout of bus stop to minimise conflict
with cycle route.Cost: £25 000
|
|
Location: Ravensbury Road Description:
Two entry treatments and cycle track provide a comfortable and direct access
to a proposed Merton Rd toucan crossing. Signals will be implemented
in 2004/5. Cost: £25 000
|
|
Westminister
|
|
Location: Covent Gardens Description:
Review of One-way’s Contribution to Area Strategy. Minor signing and
lining Cost: £15 000
|
|
Location: Hyde Park Corner Description:
Various works on Seven Stations Route via Hyde Park Corner including off
carriageway cycle path. Continued development of the remainder of the
Seven Stations route within the Borough and related feasibility studies.
Cost: £185 456
|
|
Waltham Forest
|
|
Location: Ruckholt Road Description:
Cycle facilities at two difficult junctions on A106 + 0.5 mile of cycle
lanes. Kerb build outs signal improvements and cycle lanes .
Cost: £149 713
|