What is the LCN+?The LCN+ is a planned 900km network of radial and orbital routes for cyclists covering the whole of London, which will be completed in 2010. The LCN+ will be characterised by: - a socially inclusive cycling environment where high quality standards are maintained
- routes that are continuous, fast, safe, comfortable and easy to use
- clear guidance on surface treatment and road markings where there is potential conflict between cyclists and other road users.
The London Cycle Network plus forms part of the larger London Cycle Network and is an attempt at refining this network in terms of its priority strategic routes. The LCN+ does not replace the LCN but instead ensures that conditions are first class along the key cycling corridors in London. What is the aim of the LCN+?The aim of the project is to introduce quality conditions on to the London Cycle Network plus (LCN+) in line with objective one of the London Cycling Action Plan (February 2004). It is felt that Improving London’s infrastructure for cyclists will have a significant and positive impact on the level of cycling. Well-designed cycle routes, reduced traffic speeds, designated road space and more parking facilities will encourage more Londoners to cycle. Much of the work to improve London’s cycle infrastructure is being carried out as part of the LCN+. The LCN+ Project PartnershipCurrently, 495km of the LCN+ is estimated as complete. This is due to the support and effort from partners across the public and private fabric of London’s integrated transportation environment. These include: the LCN+ Project Management team at Camden Consultancy Service (LCN+ PM team), Transport for London (tfL) the 33 London Boroughs and the Borough Cycling Officers that represent them, London Cycling Campaign (LCC), Sustrans, Cyclists’ Touring Club (CTC) and numerous private sector engineering consultancies. About the LCN+ Project Management teamThe LCN+ Project Management team form part of Camden Consultancy Service, which is located within the Culture and Environment Directorate at the London Borough of Camden. If you wish to reach the LCN+ Project Development Manager regarding the project or other Engineering Consulting and Cycle Scheme Project Management please contact [email protected]
|